3.1.2 a) |
A detailed and comprehensive description of the different services and their charges |
Services Offer
Tariffs |
3.1.2 b) u. c) 1. |
Different transportation contracts and other significant documents |
Contracts |
3.1.2 c) |
Network code / standard conditions |
Regulation
Sub-regulation |
3.1.2 c) 2. |
Specification of relevant gas quality parameters |
Specifications
Gas Quality
Sulphur Compounds
|
3.1.2 c) 3. |
Pressure requirements |
Regulation |
3.1.2 c) 4. |
Procedure in the event of an interruption of interruptible capacity |
Sub-regulation |
3.1.2 d) |
Harmonised procedures applied when using the transmission system, including the definition of key terms |
Sub-regulation |
3.1.2 e) |
Provisions on capacity allocation, congestion management and anti-hoarding and
reutilisation procedures |
Manual of Procedures |
3.1.2 f) |
Rules applicable for capacity trade on the secondary market vis-à-vis the transmission
system operator |
Manual of Procedures |
3.1.2 g) |
Rules on balancing and methodology for the calculation of imbalance charges |
Balance Rules |
3.1.2 h) |
Flexibility and tolerance levels included in transportation and with additional charges |
Flexibility |
3.1.2 i) |
Detailed description of the gas system of TSO and its relevant points of interconnection / names of
the operators of the interconnected systems or facilities |
RNTGN Description
Relevant Points
LNG Terminal Operator
Underground Storage Operator
Distribution Networks Operators
|
3.1.2 j) |
Rules applicable for connection to the system |
Networks Access |
3.1.2 k) |
Information on emergency mechanisms |
Regulation
Manual of Procedures
|
3.1.2 l) |
Procedures agreed at interconnection points (if relevant) relating to interoperability
of the network, agreed procedures on nomination and matching procedures and other agreed procedures
that set out provisions in relation to gas flow allocations and balancing |
Sub-regulation |
3.1.2 m) |
Description of the methodology and process used to calculate the technical capacity |
Manual of Procedures
|
3.3.(4),(5) |
Capacities, nominations and renominations, actual physical flows, gross calorific values |
Capacities, nominations, renominations, physical flows
gross calorific values
|
3.3.(1) f) |
Planned and actual interruptions |
TRANSMISSION NETWORK
Outages
Maintenance Plan
LNG TERMINAL
Outages
Maintenance Plan
UNDERGROUND STORAGE;
Outages
Maintenance Plan
|
3.3.(1) g) |
Interrupção planeada e efectiva de serviços firmes |
TRANSMISSION NETWORK
Outages
Maintenance Plan
LNG TERMINAL
Outages
Maintenance Plan
UNDERGROUND STORAGE;
Outages
Maintenance Plan
|
3.4.(1) u.(2) |
Information on secondary trading |
Secondary Market
|
3.4.(3) |
Balancing services |
Balancing Services
|
3.4.(4) |
Further flexibility service of TSO |
Further flexibility services
|
3.4.(5) |
Amount of gas in the transmission system and the forecast |
Forecast
Amount of gas
|
3.4.(6) |
User-friendly instruments for calculating tariffs |
Tariffs calculator
|