Skip Navigation Links
Skip navigation links
Latest News
Archive
The results of the analysis Cost benefit on data provision model are now available 
 
 

In accordance with Article 38 of Regulation (EU) 312/2014 of 26 March - Network Code on Gas Balancing of Transmission Networks, the transmission system operator carried out a cost-benefit analysis of the model for making data available, namely on the usefulness and formats of the information and the frequency of information availability and its accuracy.

The results are available here.